How to make a budget

>>> Weapons: how to get the budget tight

After communicating with the designer, the client entered the budget stage of the volume room. The client took the designer to the site to measure the length, width and height of each room, and measured the positions of the doors, windows and heating. However, it should be noted that the current status of the housing has an impact on the quotation. At the same time, the process of measuring the volume is also a process in which the customer communicates with the designer on the spot. The designer can make some reasonable suggestions based on the actual situation in the field and communicate with the customer to design the solution for the future. The integrity has been supplemented.

After the designer has completed the design plan according to the customer's requirements, he begins to formulate the budget for the home improvement and makes a quotation. The user is better to understand the budget and quotation considerations so that it is possible to discuss the feasibility of the plan with the designer. Each part of the construction process, and then a detailed understanding of the price of each construction, and can determine their own quotes are reasonable, be aware of, to sign the final decoration contract to provide guarantee.

Influence of housing status on quotation

The housing conditions of the decoration households also have a great impact on the decoration construction price. This mainly includes:

Ground: Regardless of the cement plaster or the floor of the floor tile, attention must be paid to its flatness, including the flatness of the single rooms and the floor of each room. The degree of flatness has a great influence on the price of decoration construction such as paving tiles or flooring.

Wall: The flatness of the wall must be measured from three aspects. The solid angle formed between the two walls and the ground or the top surface should be straight. The angle between the two walls should be vertical. The single wall should be flat and free from undulations. No bending. These three aspects are related to the construction unit price of the floor covering and wall decoration.

Top: The flatness can refer to the ground requirements. Light tests can be used to see if there is a large shadow to clarify its flatness.

Doors and windows: Mainly check whether the horizontal and vertical joints between the door and window fan and the cabinet are even and dense.

Kitchen and toilet: Pay attention to whether the floor is tilted toward the floor drain; how waterproof is the floor surface; waterproofing around the ground pipes (water, coal, and warm water pipes); whether there are local cracks, water marks and mildew on the wall or the top; Whether there is a drip, whether the water is unobstructed, and whether the location of the existing washbasin, toilet, bath, vegetable-washing area, and cooktop is reasonable.

Decoration budget

I. Overview of the budget for the preparation of decoration works:

The architectural decoration project is an important part of the construction project. It includes interior and exterior decoration and facilities. The decoration project shall use the “fixed amount, market price” and a once-inclusive way to compile the budget for the decoration project.

Fixed amount: The amount of main materials used and the number of days of artificial labor determined in accordance with the relevant provisions of the design drawings and the estimated budget quota.

Machinery costs: Calculated mechanical costs are calculated according to the fixed mechanical costs.

Market price: The material price and wage unit price are calculated based on the market price.

The project direct fee is determined by the quota amount and market price, and the company's operating expenses, profits, taxes, etc. are calculated and the total construction cost of the project is calculated.

Second, the role of the budget for decoration works:

It is the basis for bidding, bidding and evaluation of construction units and construction companies.

It is the basis for signing the contract, drawing the project payment and project settlement for the construction unit and the construction company.

It is the basis for construction companies to plan, implement economic accounting, and assess business results.

Third, the decoration project budget preparation basis, steps and costs.

1. Based on:

Construction drawings, current quotas, unit price, standards, decoration construction organization design, budget manual and building materials manual, construction contract or agreement.

2. Preparation steps:

Familiar with the construction drawings; Calculate the amount of work; Calculate the direct cost of the project; Calculate other expenses; Check the check; Write the preparation instructions, fill in the cover, and bind the book.

3. The composition of the fee:

The cost of building decoration projects consists of direct engineering fees, business operating expenses and other expenses.

Direct fee: The direct fee includes labor costs, material costs, construction machinery usage fees, site management fees, and other expenses.

Corporate operating expenses: refers to the management fees and financial expenses incurred by the company's operating management and building decoration management departments.

Other expenses: There are mainly profits and taxes.

Decoration budget knowledge villa design entrance decoration decoration design house window door price floor tile

LNG Mass Flow Meter

ZHejiang Sealand Technology Co., Ltd. is a trustworthy manufacturer of LNG Mass Flow Meter, LNG Mass Flowmeter, LNG Flow Meter, LNG Flowmeter, LNG meter, ATEX, IECEx & CE approved.

We are the only Chinese brand who gets ATEX, and we get it from TUV SUD, the most authoritative institute for ATEX. Our meter passed all tests carried out by TUV without any modification. Their only suggestion is to replace the cable entry device with a ATEX approved one; thus, please rest assured that we produce our meter with high standard :)

Besides, Sealand meter and calibration lab are approved by CNAS, member of ilac in China.

The 1'' flow meter specification is as follows,

Specifications of Coriolis Mass Flow Meter

Model No.

CG-25

Max. flow rate

200kg/min

Nominal diameter

25mm( 1 inch)

LNG accuracy grade

±0.2%

Zero stability

0.62kg/hr

Repeatability

0.05%

Warranty

2 years

Temperature accuracy

±1°C ±0.5% of reading

Fluid temperature

-200~160°C

Packing

1set/carton

Package size

665*660*315mm

G.W.

23kgs


Please feel free to contact us if you need any other size!

LNG Mass Flow Meter, LNG Mass Flowmeter, LNG Flow Meter, LNG Flowmeter, LNG meter

Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeter.com

Posted on