Cabinet installation Raiders cabinet acceptance details

Many people do not know how to install the whole kitchen cabinet after installation. For fear of problems, there is no need to worry about it. Under normal circumstances, the overall cabinet installation is performed by the installation master of the company, but if we have detailed instructions on the overall cabinet installation method and installation popularity. The understanding, then in the installation of the master when we are also easier to find the problem, oh, today with the small series to see the overall cabinet installation method and installation process!

Cabinet installation guide

First, the beginning of general renovation is to knock walls and masonry walls. In the initial stage of renovation of the whole cabinet, the kitchen has no wall changes, and it can be entered before the wall knocks. If you want to change the wall of the kitchen, see if there is a big impact on the design of the cabinet, there is no much impact can also be measured in advance, to avoid measuring until the beginning of the water distribution circuit, so that plans in advance. At the time of measurement, the owner should communicate with the designer about his general function of the kitchen and the use of electrical appliances in order to produce a map. The designer found on the spot where changes are needed, such as a gas meter or a gas pipe or a row. Smoke holes, etc., you should write down in detail.

Second, after the initial test, the designer will design the CAD floor plan and the 3D rendering of the cabinet according to your requirements and the actual size. At this time, you can talk to the designer directly to see the picture, mainly to see whether the design plan is in line with your own The living habits and operation area planning are reasonable. After confirming the plan, the designer will produce a detailed hydropower drawing (this is before the tiling). At this time, you can take the hydropower drawing and design plan and go back to the master of the hydropower. We must ask the master to supply water and electricity according to the drawings.

Here, add: Some homeowners' kitchens have been plastered well before the measurement, and the water and electricity are well laid. This method is not very desirable, because the water and electricity of the cloth is almost unreasonable before the solution is determined, because The chef does not consider how to lay out the kitchen more reasonably, but can only estimate it roughly. In this way, the redesigned cupboards are constrained to a great extent, often failing to achieve the desired effect. Therefore, the water and electricity must be determined after the plan is determined. It makes sense to start again.

3. After the master has got the water and electricity drawings, he must ask the master to strictly follow the drawings to build the water and electricity. After the cloth is finished, you'd better look at the drawings yourself. After the basic position has no problem, let the muddy master begin to tile the tiles. When the plaster master corrects the wall with a non-right angle, the right angle of the wall has a certain influence on the cabinet making. At the same time, if there is a need to change the gas meter or gas pipe, the exhaust hole should be synchronized at this time.

Fourth, hydropower positioning, tile completion, the necessary kitchen gas changes, and ceiling installation is complete, this time should be informed of the complex, and when the complex amount of things in the kitchen do not stack things will affect the measurement. The designer will then conduct detailed measurements, including precise dimensions, the angle of the wall, the height of the ceiling, the location of the water and electricity, the size of the gas meter and the pipe, and then go back to the complex drawings.

Fifth, the designer informs you that when the final solution comes out, you need to confirm the final plan and the choice of colors, handle styles, etc., you need to provide detailed dimensions of some electrical appliances such as the smoke machine, sink, etc. Cupboard companies do not need these problems to buy, and then sign a formal contract to order production.

Cabinet installation acceptance

1, look at the appearance. A good cabinet installation must first strictly follow the requirements of the drawings and must not change its position arbitrarily.

2, see the data. The allowable error for cabinet installation should be less than 2mm.

3, see the firmness. First of all, the wall cabinet and the wall should be firmly joined; secondly, the connection between the installation parts of the spliced ​​structure should not be loose.

4, see security performance. All drawers and pull baskets should be easy to pull, no block, and limit protectors.

The above is a brief introduction for Xiaobian. If you want to know more related information, please continue to pay attention to Qijia Consulting. More exciting consultation, please stay tuned.

Bathroom cabinets Cabinet handles Stone cabinets Cabinet installation process Cloakroom cabinets

C Shaped Type FFP2 Face Mask

C Shaped Type Ffp2 Face Mask,Ffp2 Face Mask,Ffp2 Face Mask Reusable,Ffp2 Dust Mask

Jinan Shengquan Group Share-holding Co., Ltd , https://www.sqnewmaterials.com

Posted on