Overcast and rainy day decoration with stress too heavy for paving wood floors

Decoration is a major project, finally out of the design, enter the substantive stage of decoration, but the public Mr. Zhao was a bit guilty of these two days, because of this endless rain.


Zexi solid wood flooring    Natural forest solid wood flooring

A friend told him that the continuous rainy days are not suitable for renovation. The house will be damp, but some people say that there is no need to stop work and do it slowly. The decoration master is also the latter point of view, saying that it does not matter, but he is still afraid of a new home moldy.

Yesterday, the reporter consulted Minister Zhan Shaojun of the Engineering Department of Zhejiang Zhongguan Decoration Co., Ltd. He had 18 years of experience in home improvement: “This day, the paint should not be constructed. Whether it is brushing the walls or brushing the wood, because the rain It is very heavy and easy to mold. "If you brush the wall, it will be easy to crack if you don't dry it. At the same time, the paint on the rain will be atomized. The surface of the brush will be cloudy and unclear, and the color will not be bright.

"The floor is best not to shop." Zhan Shaojun said. Whether it is paving solid wood flooring or composite flooring, because the ground is damp on rainy days, the water evaporates slowly and the glue dries slowly. In this case, paving the wooden floor will easily cause deformation or emptying in the future, especially on the first floor. , there will be a return to tide phenomenon.

“Materials should not be bought on rainy days, especially on timber, board, gypsum board, etc. Because it is easy to encounter moisture in the transportation process.” Zhan Shaojun said. After the damp, it will have moldy spots, and it will be easily cracked and deformed after drying, affecting the quality of decoration.

In addition, during the rainy days, it is necessary to pay attention to the standardization of circuit reconstruction. The bare wire cannot be buried directly in the wall or the floor, and a protected insulated wire should be added. Especially in a place where it is easy to be exposed to rain, such as a balcony, be sure to wrap the copper wire that is exposed on the outside of the wire when embedding, and prevent the wire from being short-circuited after getting wet.

In general, continuous rainy days will delay the renovation period. It is certain that this time, we can't blindly urge workers to speed up the renovation process in order to catch up. The proper shutdown is also necessary. After all, the decoration quality is the most critical.

Flooring construction acceptance entrance decoration paint decoration design home improvement house

Cooling Rack

2 tier Cooling Rack,3 tier Cooling Rack,Foldable Cooling Rack,Creative Cooling Rack

Shenzhen Lanejoy Technology Co.,LTD , https://www.szlanejoy.com

Posted on