New House Hydropower Design 7 Points to Note

The new house renovation, the first thing to do is the hydropower construction, because it is a hidden project, so it must not be sloppy, let's take a look at the experts to provide us with suggestions.

1. Shielded cables should be used for weak currents. Re-slotting and wiring are required for the secondary decoration circuit layout. Most of the weak and powerful electricity can only be piped from the ground, and it is very common for strong and weak electricity pipes to cross and close to each other. Use of unshielded cables for weak currents may cause signal interference.

2. Principles of circuit layout design Grasp the principle of “the shortest distance between two ends”, do not intentionally wind, and maintain a relatively “live line”

3. In principle, if the strong electric power pipe provided by the developer is a PVC pipe, a PVC pipe should be used for the secondary hydropower reformation, and the JDG pipe (sleeve type fixed galvanized steel pipe) should not be used, otherwise it is difficult to realize the overall grounding connection. Left behind. If the original developer provided the strong electric power pipe itself is a JDG pipe, both pipes can be used.

4. The hydropower design needs to determine whether the required water circuit reform design scheme matches the actual hydropower system (especially the second-hand house, which will be explained below). For example, if a new residential building uses a ready-to-use electric water heater, central air conditioning, and other For appliances with particularly high power, it is necessary to consider a new route from the distribution box for use.

5, kitchen water and electricity design requires cabinet design drawings coupled with safety assessment into a case

6, hydropower design must master the kitchen bathroom and other functions between the furniture, electrical equipment size and characteristics in order to make an accurate positioning of the hydropower reform program.

7, the general residential hydropower design equipment function reference configuration, with three rooms, one room, one bathroom, one kitchen, common configuration, for example, large units and so on.

Brand Shop: Many European Styles Decorate Decoration

Kitchen normal equipment: rice cookers, microwave ovens, hoods, some of the need for power stoves, console standby, basin under standby power; water heaters (wall-hung boilers, cabinets treasure) power supply and return water.

Kitchen selective equipment: oven, disinfecting cabinet, refrigerator power, washing machine power supply and drainage, soft (net) water power supply and drainage, cabinet treasure power supply water, dishwasher power supply and drainage, cabinet light power supply, background music speaker.

Bathroom normal equipment: Yuba (note that several control lines), mirror headlights, exhaust fans, hair dryer power supply; electric water heater power supply and water supply, washing machine power supply and drainage; bath, bathtub, wash basin, toilet water supply and drainage.

Optional bathroom equipment: cloth pool, phone, bidet, background music speakers.

The normal equipment in the living room: TV power supply and TV port, air conditioning power supply, network and power supply, telephone port, and both sides of the sofa.

Living room selective equipment: home theater, video sharing, projection, satellite TV, electric curtains, ceiling lighting power, security, lighting control, intelligent control system.

Normal bedroom equipment: bedside power, telephone, television, air conditioning.

Bedroom selective equipment: dual lighting control, network and power, wall lights, video sharing, curtain control, satellite TV, lighting control.

Study normal equipment: network and power, telephone, spare outlet.

Study selective equipment: background music, TV and power, video sharing, electric curtains.

Supplementary explanation: The power supply of restaurant and other bedroom equipment is relatively simple and can be changed according to actual conditions. In addition, the above equipment descriptions are only listed for normal use of functions, and it is inevitable that there are redundant or missing items. Specific analysis of individual cases is required to achieve the “tailored” effect.

Links: Second-hand housing and hydropower design 4 matters needing attention

Water Renovation Window TV Decoration Living Room Background Electric Water Heater Living Room TV Decoration Living Room Bedroom Design Function Sofa Bed Cloth Sofa Mirror Front Light Home Cabinet Bedside Wall Lamp Kitchen Cabinet Door Function Sofa Study Furniture Kitchen Bathroom Ceiling Study Room Layout Bathroom Dimensions Bathroom Design Bathroom Ceiling Bathroom Washing Hands Basin Overall Toilet Bathroom Design Restaurant Furniture Bedroom Ceiling Style Bedroom Lamp Study Design Restaurant Ceiling

Marble Powder Coatings give you marble like- finish with high decorative property, more details please refer to ChinaPowderCoating.com


APPLICATION SCHEDULE

  1. Applied by electrostatic spraying gun that can provide negative tension of 60-80 kV.
  2. Curing schedule : 180-200°C /10-15 minutes depending on the powder chemistry.
  3. Optimal film thickness : 80 -110 um

Marble Powder Coating

Marble Effect Powder Coating,Marble Texture Powder Paint,Fine Texture Marble Effect,Marble Powder Coating

Jinhu Color Powder Coating Co.,Ltd , http://www.powdercoatingscolor.com

Posted on