PPR Pipe Fitting for Hot Water with Competitive Price

Model NO.: FT2201
Trademark: Fametop
Transport Package: Carton
Specification: 20mm-160mm
Origin: China
HS Code: 39174000
PPR Pipe Fitting For Hot Water With Competitive Price(Specially designed for East Europe market;)
Material: Hyosung R200p,YanshanC4220;
Brass inserts:58-3;
Color: Green,White,Grey,Brown,Blue or as customerized
Max working temperature:95ºC;
Max working pressure:PN25;
Servide life:Over 50 years;
Applications: Cold or hot water supply, heating system including flooring heating and radiating system, central air conditioning system, industrial liquids transportation
PPR Pipe Fitting for Hot Water with Competitive Price

For more than 30 years, Polypropylene Random Copolymer (PP-R) has been applied successfully
for hot and cold water applications in countries worldwide. The combination of properties such
as resistance to internal pressure, flexibility and impact have made PP-R the material of choice for
a safe and reliable long-lasting installations. No wonder that PP-R has been continuously replacing
traditional materials like copper and galvanized steel over the last decades.
PPR Pipe Fitting for Hot Water with Competitive Price
Benefits of PP-R:
• Service life according to tests performed under ISO 15874
• No contact corrosion when exposed to iron particles
• Taste and odor neutral
• Bacteriologically neutral
• Fast and easy installation
• Entire plastic systems available
• Good chemical resistance
• Low tendency to incrustation
PPR Pipe Fitting for Hot Water with Competitive Price

Fusion Instructions:
1,Mark the pipe

Mark the pipe for depth of penetration into the heater bush and fitting (see table). The mark must remain visible under heating and joining. 
2,Heat pipe and fitting

Push the pipe and the fitting into the heating tools. Once pipe and fitting are hot (after the correct time), pull out pipe and fitting very slowly.
3,Joint pipe and fitting

Joint the pipe & the fitting and push the pipe until it reaches the mark (that has to stay outside).
During the jointing time the welded part of pipe and fitting must remain fix, without any rotation.
During the cooling time, the welded part of pipe and fitting can be adjusted until cold. 
4,Fusion inspectoin

Fusion inspection. The outer fusion seam must be inspected. The seam must be present all around the pipe.

Rod / Bar

Yinggui Metal Product Co., Ltd. , http://www.shaluminumplate.com

Posted on