8 key points determine whether your decoration is perfect!

There are many aspects involved in the renovation, therefore, the details are also quite a lot. The success or failure of the decoration has a great relationship with these details. If you ignore these details, we will lose money. Today Xiao Bian gave you a summary of the key details of the renovation, I hope to help everyone!

First, ground leveling measurements

Before laying the floor on the floor, let the floor laying staff perform the leveling work to ensure that the floor is flat and if any unevenness is found, repair it immediately to ensure the normal operation of the subsequent laying work.

Second, door measurement

Precise door frame measurement before door installation provides the basic guarantee for the installation of future doors. In addition, accurate measurement can effectively improve the degree of noise and warmth.

Third, the first measurement of the kitchen cabinet

Before the kitchen cabinet is installed, the water pipe circuit has been completed, so accurate measurement can ensure the follow-up cabinet installation work. If the measurement is inaccurate, it will affect the overall kitchen cabinet installation and even reroute the drainpipe. Whether the socket position of the hood is affected by the installation of the hood or not, whether the position of the water meter is appropriate, and whether the position of the water inlet is convenient for installing the sink later.

Fourth, hydropower reform

This is the most important thing, and it is also a place for the decoration team to make more money. It is important to keep a close eye on the layout of the decoration designer and its own needs to determine the location of the hydropower.

Fifth, acceptance of hidden projects

Refers to the completion of waterproof water, ceiling keel, woodworking paint, wall treatment, and hidden class project acceptance. After acceptance, the customer can sign for the next process.

Sixth, closed water experiment

A 24-hour closed water test is required. After confirming that there is no leakage, clean up the ground debris, remove loose parts, smooth the uneven areas, and level the entire large surface.

Seventh, kitchen and toilet waterproof

During the construction, the wall surface and the ground must be flat, dry, and clean. First brush the key parts with a brush, and then brush them all over again. The light wall is best brushed 180 cm high to prevent moisture and the closed water test cannot be less than 24 hours.

Eighth, carpentry

In a sense, the woodworking activities such as installing the pipes, decorating ceilings, and attaching plaster lines can also be considered as a detailed link in the main demolition and reform.

Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).

Decoration construction knowledge

Modular Container House

Modular Container House,Storage Container Homes,Luxury Container Homes,Container House Near Me

Suzhou Daxiang Container House Co, Ltd , https://www.dx-house.com

Posted on