Multilayer solid wood floor installation method

The installation quality of multi-layer solid wood flooring directly affects the use effect and lifespan of multi-layer solid wood flooring. Here, macro-resistant flooring introduces you to three common and used multi-layer solid wood flooring installation methods. Consumers can use their own actual conditions. Choose your own multi-layer solid wood flooring installation method.
One, direct-mounted multi-layer solid wood flooring installation method (for geothermal and non-geothermy): moisture-proof cloth and floor
1, the scope of application: apply to the ground plus or minus 2?.
2, installation steps:
(1) On the refurbished ground, firstly lay a damp-proof cloth to cover the entire ground to achieve a moisture-proof sound insulation and balance production effect. The cushion material used for geothermal should not be too thick to facilitate heat conduction.
(2) Spread multi-layer solid wood flooring on moisture-proof cloth.
Second, straight shop style multi-layer solid wood flooring installation method (applicable to non-geotherm type): plywood plus moisture-proof cloth plus multi-layer solid wood flooring 1, scope of application: applicable to the ground flatness of not more than 5MM and the second floor above the ground.
2, installation steps:
(1) To clean the floor, the splint should be sawed to a size no larger than 600 × 600 Å, and a gap of 5 to 10 Å between the splint and the splint should be reserved.
(2) Laying moisture-proof or flame-retardant foam on the plywood, the wall-side damp-proof cloth should be more than the ground 8-10MM, and do not stick between the plywood and the moisture-proof cloth.
(3) Lay the multi-layer solid wood floor on the moisture-proof cloth, and do not stick between the multi-layer solid wood floor and the moisture-proof cloth, and nail and fix the multi-layer solid wood floor with a 45-degree angle on the male nail. Three, high-rise multi-layer solid wood flooring installation method (applicable to non-geotherm type): dedicated wood keel padded splint plus moisture-proof cloth and floor
1. Applicable scope: It is applicable to the ground with the flatness of no more than 5mm and the second floor above. 2, installation steps:
(1) Prepare special wooden keels. The spacing between wooden keels is less than or equal to 350?, and the plane must be flat.
(2) Apply a water-resistant adhesive to the wooden keel. Lay the plywood with a thickness of about 12 to the skeleton. The plywood should be sawn to no more than 600 x 600 feet. The spacing between the plywood and the plywood should be 5 to 10 inches. Use an air gun to fix the headless nail into the splint and the skeleton.
(3) Spread moisture-proof cloth on the plywood, and then spread multi-layer solid wood flooring on the moisture-proof cloth, and nail the fixed solid wood floor with a 45-degree angle without nails on the male peg; Note: Actually, many Floor solid wood floor installation is carried out by the installation workers, so here is not much introduction of multi-layer solid wood floor installation steps, in addition, Hong Nai floor need to remind consumers that: multi-layer solid wood flooring installation must choose experienced, technology Skilled installers.

Silicon Barium Alloy(Low Aluminium)

Silicon Barium Alloy(Low Aluminium),Silicon Barium Calcium,Low Carbon Silicon Barium Alloy,Low Price Silicon Barium Alloy

NINGXIA HELANSHAN METALLURGY CO., LTD. , http://www.nxhlsyjferrosilicon.com

Posted on