The simplest renovation of the rough room can also be easily renovated

Finally, they hoped to make a room, but many of the owners saw the rough room and had not yet dealt with the wall surface. It was very likely that they could not start. What if your house does not want to spend a lot of renovation costs? It must have some understanding of the rough room decoration. Here 's a brief description of the simplest steps in the renovation of the rough room . We hope to help those who have this need!

The simplest decoration of rough house

The first step: check the room pipeline leaks. Many developers do not install the sewer pipe when installing the building. This has brought a lot of difficulties to the post-decoration. Therefore, before the renovation of the rough house, we must check it carefully. If leakage is found, we must not neglect it. After repairs, it will be renovated.

The second step: According to the decoration company in advance with a good decoration design program began formal renovation, first clean up the clutter of the house, decoration will be a lot easier.

The third step is to do hydropower reform first. In the first step to ensure that there is no mistake, let the designer measure the size of the cabinet to be placed at home according to the design drawings, determine the power supply, waterway reconstruction program, or buy the cabinet, Either you don't know how to put it, or if the wall circuit isn't handled properly, you have to divert the cabinet to come back. This will take a lot of time and labor costs.

The fourth step: Waterproof, circuit no problem, began to install floor drain, need to pay attention to is: the width of the wall can not be greater than 10 cm, or you will find that the shop is not enough width, can only use a small transfer instead, There is no such beauty on the ground, and there is no obvious gap between the wall roots. (Pave the ground at the same time to buy a good paint).

Step 5: After the ground is properly processed, start the paint. All the woodworking operations must have the big core board placed at the bottom, and the veneer panel is placed on the top, and then the paint can be applied. Some decoration company's workers are irresponsible and paint directly on the veneer panel. The result is that it will not crack for too long. If you use a mixture of oil, then use the spray method. Brushing the wall is the simplest. Smooth it first, then brush it again with a brush. The color of the wall should be consistent with the tone of the entire home. This should be taken into account when buying paint. After the wall roll brush finishes, it starts to put on wallpaper. This is a demanding and detailed work. Just like sticking to the mobile phone screen paper, if there are any problems, there will be folds, so be careful. The most important thing is that after the wallpaper is finished, it should be dried. Do not ventilate the window immediately. Wait 2 days to say it again.

Step 6: The ground and the walls are almost the same. Start installing the plug-in wires. After the original internal wall is processed, just buy some good plug-in boards and connect the wires. The plug-in board is best to use the button switch. This is more secure.

Step 7: Install the living room, kitchen, bathroom ceiling. At present, aluminum buckle ceiling is very affordable, cheap and quality. After you purchase the furniture, let the workers in the building materials market come to install them. The hood, stove, and kitchen sink are best installed together.

Step 8: Install the door, including the living room door, bedroom door, kitchen door, etc., to measure the height of the ground should be in advance. Then clean up the garbage on the ground.

The ninth step is to lay the floor. The floor must be leveled beforehand. Cut the floor according to the floor size. Otherwise, the floor size is different. The gap between the floors is different. The final result is difficult to see.

Step 10: Clean the house. After the renovation of the rough house was completed, there would certainly be a lot of rubbish left. We must clean the house and ventilate the windows later, so that the wind blown in will not blow the full house of rubbish.

The eleventh step: At this time, you can move the housewares purchased in advance. According to the previous considerations, placing each furniture neatly not only does not take up extra space, but also looks beautiful.

Summary: The above is the simplest decoration of the rough room construction steps, such a simple rough room decoration is basically completed, not only save money and economical and practical, I hope you can help everyone.

Simple small TV wall decoration design Japanese style simple dry area decoration design simple wardrobe decoration design house decoration simple style simple style bar decoration design

Plant Essential Oils are volatile compounds that have been widely used in perfumery, aromatherapy, cosmetics, and for flavoring food and drink, and to a lesser extent, been used in food preservation, in medicine and household cleaning products.
Natural Borneol
Litsea Cubeba Oil 
Alpha-Terpineol
Clove Oil 
Eucalyptus Oil 
Camphor Oil  
Citronella Oil 
Benzaldehyde
Benzyl benzoate
Hydroquinone

Dimethylbenzylcarbinyl butyrate

Citronella Oil Litsea Cubeba Oil

Plant Essential Oils

Plant Essential Oils,Litsea Cubeba Oil,Eucalyptus Oil,Camphor Oil,Citronella Oil

shijiazhuang yihe-chem co.,ltd , https://www.yihe-chem.com

Posted on