Main performance indicators of rubber herringbone spring

1, static characteristics. Under the vertical compression load, the average stiffness of the herringbone spring should meet the requirements. 2, vertical stiffness. 3. Lateral stiffness. Under the action of the specified vertical compressive load, when a lateral force is applied to a pair of herringbone springs to achieve a lateral deformation value of ±5 mm, the transverse shear stiffness under load shall be determined to meet the requirements, and the allowable deviation shall be less than ±10%. 4. Longitudinal stiffness. Under the action of the specified vertical compression load, when a lateral force is applied to a pair of herringbone springs to achieve a lateral deformation value of ±5 mm, the longitudinal shear stiffness under load shall be determined to meet the requirements, and the allowable deviation shall be less than ±10%. Http://news.chinawj.com.cn Main performance indicators of rubber herringbone spring

Aluminum  Extrusion Turning Opc Tube

YF provides Aluminum  A6061,A6063,A3001 and other series aluminum alloy extrusion turning OPC tubes, with both direct and indirect extruding. It's ideal for applications that require tight tolerances, thin walls, high structural integrity and predictable performance under pressure. 

1.Application: For OPC

2.Dimension: Customized dimension, OEM & ODM

3.Material: A6063, A6061, A3003 and other series alu alloy  

4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc

5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine  

OD

OD Tolerance

ID

Tolerance

Roundness

Straightness

Circular  

 run-out

φ16-20

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ20-30

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ30-50

±0.05

±0.05

0.02↓

0.020↓

0.08↓

φ50-80

±0.15

±0.10

0.05↓

0.025↓

0.10↓

6.STANDARD PACKING:Wooden case/carton

7.Trade Terms

1) Payment: 30% T/T in advance, 70% balance pay before delivery.  L/C at sight.
2) Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3) Trade Term can be chosen depending on your requirements.
4) FOB Port: Shanghai

Alumunim Tube Workshop

Extrusion Turning OPC Tube

Extrusion Turning Opc Tube,Opc Tube,Opc Drum Tubing,Turning Opc Tube

Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com

Posted on