A rough house decoration steps in the eyes of an illustrator

Hello everyone, my name is Wang Tiezhu and I am an illustrator. Originally, I had a lucrative job with a promising future, and a beautiful girlfriend. Just before the peak of my life, all this changed ... damn alarm clock! Can't you let me sleep more! Recently, my family is also renovating. I see that many friends are very concerned about the decoration steps of the rough room , but the pure text description is too boring.

Gossip less, let's get into the topic!

● The first step to get a rough new house is to accept the house. The house inspection must be treated with care to avoid problems with the construction party in the future.

● The contents to be inspected are: the flatness of the wall and the top of the wall, whether there are cracks, and whether it is empty. Whether the water circuit and launching are normal. And whether the doors, windows, doorbells and public supporting facilities are qualified.

● It is best to invite professional personnel to inspect the house, so that you can check the house more carefully.

● After the house is received, designing is the first step, whether it is self-assembly or finding a decoration company.

● The design process is: measuring the house, drawing out the layout plan and decoration budget, drawing out the effect drawing and decoration matching plan, drawing out the construction drawing, and entering the construction stage.

● The design needs to pay attention to: first determine the style of decoration you like, then go to the home market to understand the current decoration market, what materials and furniture can be bought on the market, and then design.

● The decoration is influenced by traditional culture, and it also pays attention to the good days. You can check the lucky days to choose a day that is suitable for ground construction or construction.

● Customs are different in each place, and the start ceremony is also different. The starting ceremony of Hefei is generally to choose auspicious time to set off firecrackers, and then hit the wall with a hammer three times to show that the start of the project is auspicious.

● The point to note when starting construction is that if you need to give up on the day of construction, do not set off firecrackers. You can use ribbon fireworks to avoid discomfort caused by air pollution.

● Removal of walls is divided into removal of walls and construction of walls. The main contents of the demolition work are: demolition of the wall and shoveling of the wall skin.

● It should be noted that the wall should be removed after the wire is cut to protect the finished product, especially the floor drain.

● It is necessary to pay attention to the reinforcement work such as planting bars and hanging nets.

● If you need to install central air conditioning or heating in your home, you must lay pipes before and after water and electricity.

● The installation steps of the central air conditioner are: to determine the location of the internal and external machines, to punch holes, to punch holes, to install pipes and to protect the finished products.

● The installation steps of heating are: slotted pipe, install water distributor, pipe, and suppress.

● This step is pre-laying. After the construction is completed, radiators and air-conditioning vents need to be installed. If you do not consider installing these devices in your home, you can directly enter the hydropower stage.

● Hydroelectricity transformation is a hidden project in the decoration. If a problem occurs later, it will cause a lot of losses, so we must pay great attention to it.

● The construction steps of hydropower are generally: checking the original circuit in the home, determining the location according to the design plan, grooving, piping and wiring, inspection and testing, data archiving, pipe sealing, and site cleaning.

● Before the completion of the hydropower construction, be sure to take photos of the size and archive, in case the later maintenance can not find the location.

● Electricity goes to the ground, water goes to the top, the water pipe should be horizontal and vertical, and the electric wire should go the shortest distance at two points.

● The bricklayer will be dirty during construction, so it is best to put it in front of the carpenter.

● The bricklayers generally need to do wall and wall construction, cement leveling, water pipes, and wall and floor tiles.

● The normal operation process is: first level the line-treat the base layer-do waterproof-then lay the wall and floor tiles.

● It should be noted that waterproofing is best done by a professional waterproofing company. The floor drain should be of better quality.

● You can feel the overall structure of the home when you are carpentry construction.

● The main work of carpentry is suspended ceiling, gypsum board partition wall, cabinet making, wooden modeling and installation of hardware. Customizing the whole house is becoming more and more popular, and the workload of carpentry is getting smaller and smaller.

● The process of carpentry is generally as follows: reviewing drawings and submitting-tool materials entering the field-making the basic frame-packaging-checking and acceptance.

● If the board and glue used in carpentry construction do not meet the environmental protection standards, a large amount of harmful substances such as formaldehyde will be released. Therefore, the selection of materials must be careful.

● Painting is a face project in decoration, pay attention to the details. The paint is mainly divided into latex paint on the top surface of the wall and wood paint on the home.

● The construction steps of paint are generally: repairing the surface-base treatment-surface coating.

● Latex paint is not required to be applied to the wall.

● When opening windows and ventilating, do not open the doors and windows too much to prevent cracking caused by contraction too fast.

● After the preliminary construction is completed, there must be a lot of garbage and remaining materials on site, which needs to be cleaned up.

● During the subsequent installation process, it is best to keep the house in a relatively tidy state to reduce damage to the finished product.

● Matters needing attention: Keep useful materials when disposing of garbage. If you have a toned latex paint in your home, you must save it and use it in later repairs.

● The kitchen and bathroom are easy to use aluminum buckle ceiling, plastic buckle board and gypsum board are not conducive to later maintenance.

● If you want to install Yuba, Lengba and other equipment, reserve power in the early stage of hydropower.

● Wallpaper is a very decorative element with many colors and patterns. Choosing wallpaper has also become a tangled matter. Following the six-three-one rule of decoration and matching, you can find your own skills.

● The sequence of wallpaper construction is best placed before installing the door and the switch panel, so that when the door switch panel is installed, the wallpaper can be pressed, and there will be no warping.

● There is another point to note: the glue used for wallpapering should not stick to the latex paint. If it is stuck, it should be cleaned in time, which will cause the latex paint to fall off.

● Many of the following installation projects require live operation, so the switch panel can be installed. At the same time can also install downlight shot and lamp belt.

● Cabinets can be installed together with customized furniture.

● In the early stage of cabinet design, the power supply position of equipment such as oven disinfection cabinets should be considered.

● The installation steps of cabinets are generally as follows: installing floor cabinets-installing hanging cabinets-installing countertops.

● After the cabinet is installed, you can install the stove and sink of the hood. Before installation, the gas must be turned on to facilitate debugging.

● The check valve of the flue checks whether the quality is reliable, and if it is not good, it can be replaced at this time to avoid smoke back in the later period.

● Some cookers and sinks also need to be plugged in. It is necessary to know whether to reserve power in the early stage.

● The gas water heater must be installed in a well-ventilated space, and the exhaust gas generated during its work will cause harm to the human body.

● If the gas is far away from the bathroom, you can also consider installing a small water heater in the bathroom so that hot water comes quickly and is more convenient to use.

● Electric water heaters should be wired according to power.

● This step includes: toilet, bathroom cabinet, shower room, towel rail and other hardware accessories.

● Angle valves and hoses when installing sanitary ware are generally purchased separately. If the installer does not provide them, they must prepare them in advance.

● There are many precautions for sanitary ware. Generally speaking, it is more convenient to use.

● The order of decorating the wooden door is: assembling the door cover-installing the door leaf-installing the lock-installing the door cover line-installing the door suction.

● It should be noted that the material of the door cover line and the skirting line are preferably the same, so that a complete and smooth line can be formed.

● The diagonal of the door cover is preferably a 45-degree cut angle.

● Decide the installation process according to whether you choose solid wood flooring, solid wood multilayer or laminate flooring.

● If it is a solid wood floor, you must first clean the ground, install wooden keels, and then sprinkle camphor wood chips (from insect control and mold resistance), and finally install the floor and install baseboard.

● If the laminate floor is installed, the ground leveling should be done in the early stage, otherwise there will be a drop in the bathroom.

● Curtains can be installed after the floor is installed. Curtains generally have curtains, venetian blinds and Roman blinds.

● You can install the curtain rod first, and then hang the curtain after cleaning, so as not to stain the curtain.

● Curtains are as diverse as wallpapers. The choice should be based on the decoration style of the home, and then according to the collocation rules to create a more perfect effect.

● This step refers to the installation of main lamps such as pendant lamps, ceiling lamps, wall lamps, etc. The downlight spotlight is installed at the step of the switch panel.

● The reason why the installation of lamps and lanterns is put to the end is because many crystal lamps and many American lamps are more afraid of ash. During this period of installation, the house is relatively clean.

● Here, the installation work at home is basically over, let the dusty home look new.

● Keep in mind that you should not wipe the home with chemicals to avoid corrosion. Also don't use steel wire brush to clean the tiles, there will be scratches.

● After cleaning, several pairs of shoe covers should be prepared for home improvement. In the later stage, some masters will send furniture and appliances to reduce damage to the ground.

● After the cleaning is finished, the furniture can be assembled on the site. Generally, there are sofas, dining tables, beds, desks, bookcases, etc.

● When carrying furniture, be sure to protect the corner door and the furniture itself, so as to avoid damage.

● At this time, you can buy some bamboo charcoal bags to put in the cabinet to purify the air. You can also buy some plants such as green radix to purify the air in the new house and increase the indoor humidity.

● Home appliances such as washing machines, refrigerators, TVs, air conditioners, etc. can be delivered and installed.

● At this step, we must also pay attention to the protection work.

● Collect and save all manuals and warranty cards for future search.

● Furnishing is a profound knowledge. The early decoration can be very simple, even just a white wall. A great effect can be achieved by the later decoration and matching.

● There are many items in soft decoration, here mainly refers to decorative objects such as decorative paintings, vases, table lamps, green plants, etc. Each object can reflect the taste and temperament of the house.

Hello everyone, this is Wang Tiezhu! I am an illustrator! The above is the graphic version of the rough house decoration process that I have compiled. If you find it useful, you can store it. And, if you are single, we can have further communication!

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

Rough house decoration process