Renovation notices five major issues increasing the cost cycle

Foreword: As most of the second renovation needs to dismantle the contents of the past renovations, and to make up for and repair the defects of the building, plus some additional engineering fees such as garbage cleaning and transportation costs should also be considered within the total cost, so the second decoration The cost may be higher than the cost of the initial renovation. Many second-home renovation families have encountered such thorny problems. So, where is the secondary decoration difficult?

More expensive

The demolition part mainly involves the removal of old doors and windows, old ceilings, floor tiles, paint layers, plastering floors, etc., as well as certain non-bearing walls and original use facilities that change the layout of houses. Repair defects mainly include defects in the interior surface of the original building, aging of various facilities and equipment, unreasonable layout of hydropower pipelines, and lack of weak electrical equipment.

These costs will vary according to the actual conditions of the house and the materials and processes. Many problems, such as the decay of the wall, will only be discovered after the old surface is removed. Therefore, the owner should prepare in advance, and the home improvement company You should do a good job of informing in advance and change the cost at any time.

Request better

Many houses were completed earlier. At that time, the residential design was only designed to satisfy the simplest living requirements. There were no more designs for comfortable functions and facilities. Therefore, the second renovation attached importance to the improvement and perfection of the function of the living room, but this also gave a second time. Decoration has made it more difficult. In order to solve this problem, families who need to prepare for the second renovation should put forward reasonable reform opinions based on their own income level and the particularity of the housing structure, and use comfort and sufficient standards as standards.

Consider more

The secondary renovations are basically carried out in residential quarters and multi-storey residential buildings that have already occupied a large number of residents, so the decoration construction environment is more complicated. The owner and the decoration company should give priority to the impact on the neighbors during the construction process, not only the construction time, noise and odor, but also the defects of the residential structure, the use of elevators, the transportation and storage of materials, and the stacking of garbage. Factors such as clearing of transport and hydropower construction impact on other households should be considered. In addition, some construction projects will also have special effects on the elderly, pregnant women, students and other special groups. The owners and decoration companies should patiently coordinate these relationships.

In addition, the overall time for the second renovation is generally 15 days to 30 days longer than the initial renovation. In particular, owners who rent out a turnover house outside the home must be able to spend extra time to cope with the extension of the duration caused by the unexpected situation.

The second decoration has some special considerations, mainly including:

1, to try to vacate the house, leave room for decoration construction, it can not be removed, can be negotiated with the decoration company fully enclosed and placed in a position that does not affect the construction.

2. When demolition of the door and window of the facade, it is necessary to obtain the consent of the residential property or housing management department of the community in advance, especially the residential buildings facing the main street.

3, if the need to adjust the layout of the room to remove the wall or open the door openings, we must not change the load-bearing wall, because the load-bearing wall is related to the overall safety of the residential structure. The removal of general walls also requires the prior consent of the property or house management department.

4. It is necessary to understand the direction, location, and diameter of residential hydropower pipelines, and to communicate with home improvement companies to improve their plans. If there is a change in the gas system, it should be changed by the gas department. For smart systems and defense systems that have already been installed in some homes, it is necessary to contact a professional manufacturer or property in advance and take protective measures.

5. Do a good job of informing the neighbors in advance, and ask the elderly, children, pregnant women, and patients with special requirements to know in advance and discuss with them the construction time.

Recommended links: two aspects into the home improvement price expert

Recommended links: rookie must see how to decorate the company with pricing and signing

Renovation starts preparation of entrance decoration restaurant decoration residential home improvement housing window decoration design decoration decoration company

Other Ignition Coil

Ignition Coil Generators,Ignition Coil For Small Engine,General Motors Ignition Coil

Tall Automobile Parts Co., Ltd. , http://www.skye-ignition.com

Posted on